Assembly: in a period of 48 hours, we had to integrate all this tech together in a way that was convenient for our testers at RPI to use, so we constructed a Base and Dashboard. This included installing: – The holster for the Top Hat Evolve™ units, so we could swap out Gold Hat and White Hat – A steel neck to hold the dashboard – A piece of lumber to hold the wiring box, the quick pressure disconnects & the wires – Wiring box – Gas lines – Solenoid Crib so we could contain the Solenoid Switches – Solenoid Switches – Vinyl graphics for safety labeling and corporate branding – Bread board – Final wiring of the Optical Water level Sensors. We were ready for transport on July 31st, 2016.